US 160 Signal Timing Project - Alamosa

Joe performed a signal timing project on US 160 in Alamosa.  The corridor consists of a one-way pair including Main Street and 6th Street in the central business district.  Project tasks included collection of traffic count data; review of intersection operations in the field; performance of cycle length evaluations; development of recommended cycle, offset, split, and interval timing; and formatting the timing for W4IKS.  The timing involved the coordination with the railroad grade crossings south of 6th Street to develop preemption timing and operation. 

Back to Traffic Signals page